Pallet Racks in Huachuca City, AZ
Pallet racks in Huachuca City, AZ fit workshop-and-warehouse buildings along Highway 90 and Highway 82. Small-bay warehouse racking, shelving and cantilever cover most contractor and service-business needs.
These buildings are small, so every row has to earn its place.
Small-Bay Selective Rack
Industrial stock here is small: workshop and warehouse buildings of about 3,000–4,800 SF. Selective pallet racks usually run along the long walls, leaving the center for a work area.
Beam levels are set for the loads you handle most. Wire decking turns upper levels into shelf space for boxed stock.

Cantilever for Contractors
Electrical, plumbing and fencing contractors keep pipe, conduit and posts on hand. Cantilever rack along a wall or in the yard keeps them sorted by size.
Outdoor runs get finishes for the sun and planning for monsoon season.
Service and Supply Businesses Near Fort Huachuca
Huachuca City sits on State Highway 90, about 64–65 miles southeast of Tucson and 5 miles north of Sierra Vista, at the Highway 90 / Highway 82 junction. Service and supply businesses working around Fort Huachuca store tools, spares and equipment.
Shelving with bins handles small parts, and a few bays of pallet rack handle the heavier boxes.
Zoning and Installation
Town zoning includes a C-2 Light Industry district and a C-3 Heavy Industrial and Mining zone. We lay out to the building you have and send an itemized quote.
Experienced installation crews we schedule and manage put the bays in, anchored to the floor. Sierra Vista is next door; for moves, see warehouse relocation.
Laying Out Pallet Racks in a Small Shop
In a 3,000–4,800 SF building, rack competes with work benches, vehicles and equipment. We start by marking what has to stay open.
Pallet rack usually goes on one long wall. Shelving goes near the work area for parts used daily. Cantilever goes outside or along a short wall.
Low ceilings mean fewer levels, so we set beam heights to the real loads. A forklift may not be needed at all if loads are light enough to hand-stack.
Every layout comes with a CAD drawing and itemized quote. If your sizes are standard, the 48-hour quick ship program for standard pallet rack components may apply.
Small-Shop Shelving and Rack Together
Service businesses here need tools and parts close to the bench. We combine shelving units for small items with two or three bays of pallet rack for boxed stock.
Wire decking on rack levels lets the upper bays act as shelving too. Light loads can go on shelving without a forklift, which suits shops that do not run one.
Cantilever outside handles pipe, posts and conduit, with finishes for the sun and monsoon storms. Install takes place during business hours, Monday to Friday, with summer starts early in the day.
Contractors in the C-3 Heavy Industrial and Mining zone often handle heavier stock than a light-industry shop. Beams for those bays are sized to the heaviest pallet, and load plaques go on each one. Shelving near the door keeps small fittings at hand.
Some shops store vehicle parts and seasonal equipment in the same building. Adjustable beam levels let one row carry tall items in summer and boxed stock in winter. Teardrop connections mean a beam can be moved by hand without tools, so the shop can change the setup as work changes.
Warehouse Racking for Small Shops
Get a Small Shop Layout
Call (520) 335-3953 or use the form.
Small Shop Storage Questions
Nearby Service Areas
Make Room in Your Shop
Free layout. Itemized quote.