Pallet Flow Rack and Pallet Racks in Amado, AZ
Pallet flow rack in Amado, AZ serves the large greenhouse operations that pack tomatoes year-round. Pallet flow keeps packed product rotating out of the cooler in the order it went in.
Pallet racks for the area's small farm-supply buildings are a different job: low clear and tight floors.
Greenhouse Produce Packing and Cold Storage
Large year-round commercial greenhouse operations growing organic tomatoes have expanded here, moving the area from ranching to greenhouse farming. Packed produce needs cooler space between the packing line and the truck.
A pallet flow rack loads from the packing side and picks from the dock side, so the oldest pallet ships first. Cold rooms get cold-rated components.

Selective Rack for Packaging Supply
Packing lines burn through cases, trays, labels and pallets. Selective pallet racks near the line keep those supplies within a short forklift trip.
Beam levels follow bundle heights, and wire decking keeps loose cartons from slipping.
Low-Clear Rack for Farm-and-Feed Buildings
Existing commercial buildings here are small, with farm-and-feed warehouses around 4,800 SF and about 15 ft ceilings. That height allows two beam levels plus the floor for most bagged feed and seed.
Fencing, pipe and lumber go outside on cantilever rack, sized to length and planned around monsoon wind.
Salcido Ranch and the I-19 Exits
Amado sits on I-19 between Green Valley and Nogales, at the Arivaca Rd interchange (exit 48) and exit 42 near the Border Patrol checkpoint. Salcido Ranch offers about 610 acres at exit 42, including 27 freeway-visible acres zoned M-1.
Frames go up anchored to the floor, set by experienced installation crews we schedule and manage. Rio Rico and Green Valley are next door, and moves are covered by warehouse relocation.
Sizing Pallet Flow for a Packing House
A packing house cooler runs on the packing schedule. Pallets come off the line in bursts and leave by truck in batches.
We size lane depth to the number of pallets per SKU in a normal batch. Lanes that run too deep sit half-empty; lanes too short force overflow onto the floor.
Pallet weight sets roller pitch and brake spacing. Wet or damaged pallet bottoms can hang up on rollers, so we ask what pallets you use.
In smaller farm-supply buildings with about 15 ft ceilings, beam levels go to the heights of your bagged loads. Two levels plus the floor is common.
You get a CAD drawing and an itemized quote with lead time confirmed. Flow lanes are high-density parts; standard teardrop frames may qualify for the 48-hour quick ship program.
Ag Yards and Cantilever Runs
Farm-supply yards along I-19 store fencing, posts, pipe and lumber outside. Cantilever arms keep those items sorted by length and off the ground.
Outdoor runs here face full sun and monsoon wind and dust from June 15 through September 30. We pick finishes for that exposure and talk through load restraints for the windiest months.
Installs in the cooler and the yard are scheduled separately, so packing does not stop while the yard is built.
Greenhouse operators sometimes hold seedling trays, growing media and packaging in a dry building beside the cooler. Selective rack with wire decking handles all three on the same frames.
Pallet Flow Rack System and Other Options
Plan a Packing-House Layout
Call (520) 335-3953 or use the form.
Greenhouse and Farm Supply Questions
Nearby Service Areas
Keep Packed Produce Moving
Free layout. Itemized quote.